Lean outsourcing: It’s coming

The most direct way to achieve this relationship is through the physical proximity of a regional supply chain. “I think lean points you to that regional model. Still, if that regional model doesn’t give you that ultimate low-cost situation, somebody who sort of cracks that nut and figures out how to do that well with a longer pipeline by using some of these lean techniques and concepts and still gets as much waste out of the system as they can could potentially out-compete you,” says Olsen. He suggests that use of electronic communications may offer a substitute for proximity to circumvent some of the difficulties in long-distance supplier relationships.

One method that OEMs can apply in a lean outsourcing model is to examine the operations of currently used EMS providers, particularly those in low-cost regions. If any providers “are still using old-fashioned or mass-productions techniques where they have tons of inventory, wasted labor in their production lines,…you’re essentially leaving some money on the table,” says Olsen.

“If you head down that lean path as an OEM, it’s almost a prerequisite that eventually you’re going to lean out your entire supply chain. And all your contractors are eventually going to be lean in some way,” he says.

When an OEM converts to lean outsourcing, it can impact EMS providers in the supply chain. Take Jabil. The company recently reported that its production levels in the networking segment are expected to drop by about 25% in the May quarter followed by a 100% increase in the August quarter as a result of the lean manufacturing initiative of a communications customer. It is widely believed that this customer is Cisco. The 25% decrease stems from inventory being taken out of the supply chain as Jabil and its customer collapse a two-stage manufacturing process into one. The 100% increase in the following quarter reflects a conversion of business from consignment to turnkey.

EMS providers with a track record in lean manufacturing may have a competitive advantage with OEMs looking to go lean. “When you implement lean, you’re going to want some kind of access to expertise,” says Olsen. He adds, “I would be distrustful of a contract manufacturer that said, ‘I just implemented lean six months or a year ago,’ as far as being able to get expertise from them.” According to Olsen, it generally takes two to five years to achieve a lean culture in a company.

Implementing a lean outsourcing model is not without its challenges. If OEMs are to switch to a pull system called for by lean manufacturing, they must get a better handle on the demand of their customers. Only then can their EMS providers change from build to forecast to build to order.

Then there’s the matter of where inventory ends up in lean supply chains. “Because the OEMs have the power, they pass it down to the subcontractors. And the subcontractors are the customer so they pass it back down to the component folks. But ultimately, somebody has to pay for that,” says Olsen. “You’re either going to pay for it with your component folks holding huge amounts of inventory….Or you’re going to work with your component folks to reduce it to a level that is commensurate with the capability of the process.”

Lean outsourcing may not be easy, but Cisco’s lean program is a major endorsement of the concept.

John Tuck is publisher and editor of Manufacturing Market Insider. (www.mfgmkt.com)


Ask a Question in Q&A  or click here to leave a comment

My question pertains to the article on this page.


Tags (optional)

Human Verification (required) 9 + 0 =

  or log in or sign up    

You can ask questions anonymously whether or not you are a member of VO GlobalNet. However, by logging in and asking questions in your name you will receive an email notice whenever a user answers your question. Plus, you can build your reputation with site users.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

You might also like:

Browse GlobalNet Member profiles.