NPI – New Product Introduction

How I overcame product design engineering challenges and avoided conflict

By

The problem with some product program plans is they can be risky because project requirements are rarely properly designed, plus there are often accountability issues that can easily surface, and team synergy is either not present or it is very low.
Read more »

Top five mistakes OEMs make with EMS providers

By

Economic uncertainty in the current global environment is forcing OEMs to turn their current business models upside down just to survive. Learn from these 5 common OEM mistakes and avoid ruining your OEM-EMS relationship.
Read more »

Full report: EMS / ODM worry about profitability as fall 2011 survey reveals pessimism in electronics supply chain

471 survey respondents from EMS/ODM, Component Manufacturers, Distributors, Electronic Equipment Manufacturers, OEMs and Semiconductor Manufacturers answer questions on the economic situation; employment, inventory levels, business volume, and prices providing insight into the levels of …
Read more »

Inside ODM contract service agreements

By

Shorter product lifecycles creating more losses for OEMs.  Engineering change orders can define IP ownership. ODM vendor selection transparency is vital. IT integration can offer significant savings for OEMs.
Read more »

OEMs can avoid EMS mistakes during NPI

Excess inventory is a liability to both the EMS provider and OEM. This exposure must be watched closely by both since the EMS provider will undoubtedly come back to the OEM looking for payment for exposed material left over. If OEMs feel the EMS provider is not practicing proper procurement practices, OEMs should push … 
Read more »

The wrong message: EMS value proposition still rooted in cost reduction

By

The fundamental, real problem with the EMS industry is its inability to effectively communicate its value proposition. The pressure on EMS firms relates to the mistaken belief the core value proposition of outsourced manufacturing is cost reduction for …
Read more »

Three year forecast: EMS without Sanmina-SCI

By

The main question, at least on the minds of investors, is whether or not the Company can turn itself around. The question on the mind of OEM executives is …

Read more »

New product introduction (NPI) quoting and the OEM

By

OEM companies engaged in quoting exercises for new product introduction (NPI) business services with contract manufacturers can expect the capable contract manufacturer to carefully lead the OEM through an established and itemized list of NPI product requirements and processes.

Read more »

Contract pricing, profits, and OEM direct costs

By

While there are some common outsourcing manufacturing contract formats, no two contracts are identical and, there is no viable, common platform that can be applied to every outsourcing contract pricing model with regards to either party’s profits.
Read more »

5 improvement opportunities ranked by contract manufacturers

Our survey asked electronics contract manufacturers, original design manufacturers, and prototype houses to rank, in order of importance, their top 5 improvement opportunities. Read what they selected.
Read more »

You might also like:

Browse GlobalNet Member profiles.