NPI – New Product Introduction

Project and program management for electronics manufacturing

By

Stop losing money. Learn what’s important to EMS providers in OEM-EMS relationships and manage manufacturing supply chain operations more effectively. The following examples are from recent, actual working engagements with program management teams inside EMS providers. Engagements focused on improving program management sense of urgency while paying closer attention to managing the profit center in OEM customer programs.
Read more »

Electronics product flowchart for NPI

By

Most standard NPI business models contain four turn time variations. These include the standard five-day turn, a three-day turn, a 48-hour turn, and the increasingly-popular 24-hour turn.
Read more »

Understanding the mind of the semiconductor design engineer

By

Design engineers need to know they are picking the best components for their design. But, it turns out their biggest fear is not knowing whether the component parts they choose will be reliably available for the entire life of the product they are designing.
Read more »

5 Rules for effective EMS provider quarterly business reviews (QBR)

By

You should be able to see metrics improving quarter-on-quarter while also being able to determine whether (or not) what was committed the previous quarter was accomplished the following quarter.
Read more »

Nine key points help OEMs negotiate better contract service agreements with EMS providers

By

Senior operations executive and GlobalNet member Steve Linahan writes how EMS providers live and die by purchase price variances (PPV). In the article, Steve talks about OEM-EMS contract service agreements and how EMS providers use elaborate cost v. price methods, or activity based costing…
Read more »

How I overcame product design engineering challenges and avoided conflict

By

The problem with some product program plans is they can be risky because project requirements are rarely properly designed, plus there are often accountability issues that can easily surface, and team synergy is either not present or it is very low.
Read more »

Top five mistakes OEMs make with EMS providers

By

Economic uncertainty in the current global environment is forcing OEMs to turn their current business models upside down just to survive. Learn from these 5 common OEM mistakes and avoid ruining your OEM-EMS relationship.
Read more »

Full report: EMS / ODM worry about profitability as fall 2011 survey reveals pessimism in electronics supply chain

471 survey respondents from EMS/ODM, Component Manufacturers, Distributors, Electronic Equipment Manufacturers, OEMs and Semiconductor Manufacturers answer questions on the economic situation; employment, inventory levels, business volume, and prices providing insight into the levels of …
Read more »

Inside ODM contract service agreements

By

Shorter product lifecycles creating more losses for OEMs.  Engineering change orders can define IP ownership. ODM vendor selection transparency is vital. IT integration can offer significant savings for OEMs.
Read more »

OEMs can avoid EMS mistakes during NPI

By

Excess inventory is a liability to both the EMS provider and OEM. This exposure must be watched closely by both since the EMS provider will undoubtedly come back to the OEM looking for payment for exposed material left over. If OEMs feel the EMS provider is not practicing proper procurement practices, OEMs should push … 
Read more »

You might also like:

For program/project management decision makers